Building a house in Bangalore is a regulatory project before it is a construction project. Your plot's khata status determines whether you can get a plan sanctioned at all. FAR and setbacks determine how much house you can actually build, which is often less than the plot size suggests. And the Occupancy Certificate at the end determines whether you can get a BESCOM connection, a home loan disbursed, or sell the property later without a discount.

Residential Construction

Introduction

As a residential construction company in Bangalore, Candidscape builds with interiors and structure handled by the same team — so the finish detail is planned while the structure is still on paper, and the build follows the sanctioned plan rather than deviating from it in ways that surface later as an OC problem.

Residential Construction

Our Residential Construction Services

Ground-up house, villa and duplex construction

Site feasibility study

khata status, zoning, road width, FAR and setback assessment before design

Architectural and structural design coordination

Structural works

foundation, RCC framing, columns and slabs

Masonry, plastering and blockwork

Waterproofing

terrace, wet areas, sunken slabs and retaining structures

Electrical and plumbing installation

Flooring, tiling and finishing works

Roofing, parapet and external façade works

Painting, external finishing and compound works

Integrated interior fit-out on structural completion

Renovation, extension, additional floors and structural modification

Residential Construction

Why Choose Candidscape for Residential Construction?

We build to the sanctioned plan. Deviating from the approved drawing is the most common reason an Occupancy Certificate becomes difficult — and it's usually discovered at the end, when correcting it means demolition. Building to sanction is not a premium service; it's the baseline that protects your loan eligibility and your resale.

Interiors planned with the structure. Because we do both, service routing, storage volumes, false ceiling depths and finish levels are resolved while the structure is still drawings — instead of chasing walls after they're built.

Waterproofing detailed, not assumed. In Bangalore's monsoon, terrace, sunken-slab and wet-area waterproofing failures are the defects that surface two or three years in and cost the most to remedy. They get detailed at design stage.

Design validated before build. AI validation pressure-tests the design against the brief before concrete is poured, when changes are still cheap.

One accountable team. No structural contractor blaming the interior contractor, and no gaps between scopes for problems to sit in unclaimed.

GST registered and Karnataka Shops & Establishments compliant.

Residential Construction

Our Construction Process

Site & title feasibility

Before design, we assess plot dimensions, road width, zoning, permissible FAR and mandatory setbacks, and flag khata status. This determines what can actually be built, and occasionally changes the whole plan.

Design & AI validation

Architectural and interior design developed together, then digitally pressure-tested against the brief and the site's regulatory envelope.

Plan sanction support

Drawings prepared for submission through the BBMP/GBA building permission system by a registered architect. We coordinate with your architect and consultants on drawing requirements and departmental queries.

Costing & contract

Scope, specification, materials and programme fixed in one documented agreement with defined milestones.

Foundation & structure

Excavation, foundation and RCC framing executed to structural drawings, with plinth-stage documentation as required.

Services & civil works

Electrical, plumbing, masonry, plastering and waterproofing sequenced so nothing later has to undo something earlier.

Finishing & interiors

Flooring, joinery, painting and the interior fit-out, completed by the same team that built the structure.

Completion & handover

Quality verification against specification, handover documentation, and support for the Occupancy Certificate application.

Residential Construction

Types of Residential Projects We Build

Independent houses on individual plots

Villas

Duplex homes

Multi-floor residential buildings and rental-income properties

Additional floors on existing structures

Home extensions

Full structural renovations and retrofits

Residential Construction

Our Construction Expertise

Regulatory envelope planning

Designing within permissible FAR, setback requirements, height limits and parking provisions from the outset, rather than designing freely and then cutting the house down to fit.

Structural execution

Foundation, RCC framing and load-bearing work to structural drawings, with the reinforcement and concrete specification actually followed rather than substituted.

Waterproofing systems

Terrace, sunken slab, wet area and retaining wall detailing, treated as a designed system rather than a coat applied at the end.

Services integration

Electrical and plumbing routed with the final interior layout already known, which is only possible when the same team is doing both.

Sequencing discipline

Trades ordered so finishing work isn't damaged by works that should have preceded it.

Material specification

Grade-appropriate steel, concrete mix and blockwork specified and verified, since substitution here is invisible on site and permanent.

Residential Construction

Areas We Serve

Priority areas: RMV 2nd Stage, Sadashivanagar, Malleshwaram, MSR Nagar, New BEL Road, Hebbal, Yelahanka

Also serving: Jayanagar, JP Nagar, Indiranagar, Koramangala, Whitefield, Sarjapur, Dollars Colony, Hennur, Thanisandra

Residential Construction

Why Homeowners Trust Candidscape

Since 2024, Candidscape has delivered 73+ projects across residential, healthcare, government and commercial work. Homeowners choose us for construction for a structural reason: the team that pours your foundation is the team that installs your wardrobes. Nobody can tell you a finish problem is the other contractor's fault, because there isn't another contractor.

Residential Construction

Frequently Asked Questions

My plot has a B-Khata. Can I still build?

Not directly — BBMP will not process a building plan application on a B-Khata property. It has to be regularised or converted to A-Khata (now e-Khata) first, and that's a separate process with its own timeline that has to be completed before plan submission. We flag khata status during the site feasibility study, because discovering it after you've committed to a design is a costly way to learn it.

How much can I actually build on my plot?

Less than most owners expect. Permissible built-up area is governed by the FAR applicable to your zone, and the footprint is further constrained by mandatory setbacks on all sides, with additional requirements for corner plots. Road width also affects what's permitted. We assess all of this at feasibility stage, before design, so the house you fall in love with is one you're allowed to build.

Do you handle the building plan approval?

Plan submission through the BBMP/GBA system must be made by a registered architect or licensed professional. We coordinate closely with your architect and consultants on drawing requirements, site verification and departmental queries. If you don't already have an architect, we can work with you to bring one in. We'd rather be precise about this than claim to sanction plans ourselves.

Why does building to the sanctioned plan matter so much?

Because the Occupancy Certificate depends on it. The OC confirms the building matches the approved plan — and without it, BESCOM and BWSSB connections can be refused, home loan disbursement gets complicated, and resale becomes materially harder. Deviations are cheap to make during construction and extremely expensive to correct afterwards.

What happens if my approval expires before I start?

A sanctioned building plan is valid for a defined period from the date of issue. If construction hasn't commenced within it, renewal is required — a simpler process than the original sanction, but one worth planning around rather than discovering.

Is the interior work included, or is that a separate contract?

It can be included, and most of our clients scope both together. That's what allows interior detail — service routing, storage, ceiling depths — to be designed alongside the structure rather than retrofitted into it.

How long does building a house in Bangalore take?

It depends on plot size, number of floors, specification and — often the biggest variable — how quickly approvals move. Approval timelines are driven mainly by documentation completeness, outstanding property tax dues and land-use classification rather than by processing speed. We commit to a construction programme after feasibility and sanction, when the variables are known.

Do you take on renovations and additional floors, or only new builds?

Both. Structural renovations, extensions and additional floors are within scope — though additional floors require checking that the existing structure can carry the load and that the addition stays within permissible FAR and height limits.

Have a plot in Bangalore and a house in mind? Start with a feasibility conversation — what’s permissible on your plot shapes everything that follows.